GPU server

4U8G-TURIN2/RF+

Complete DVT (design validation test)
4U8G-TURIN2/RF+ — GPU server

NVIDIA RTX PRO™ 6000 Blackwell Server Edition NVIDIA RTX PRO™ 6000 Blackwell Max-Q Workstation Edition NVIDIA H200 NVL

Availability & lead time

Production phase
Complete DVT (design validation test)
Standard lead time
16-20 wks
Forecast lead time
8–12 week or faster
Minimum order
Standard Model: No minimum order quantity applies. Availability will be confirmed based on real-time stock status.

Specifications

  • Enhanced airflow for reliable cooling of 600W GPUs and accelerator cards
  • 4U Rackmount with 3+1, 80-PLUS Titanium, 2700W CRPS
  • Dual Socket SP5 (LGA 6096), supports AMD EPYC™ 9005/9004 (with AMD 3D V-Cache™ Technology) and 97x4 series processors
  • 12+12 DIMM slots (1DPC), supports DDR5 RDIMM, RDIMM-3DS
  • 4 hot-swap 2.5" NVMe (PCIe5.0 x4) drive bays, 20 Hot-swap 2.5" SATA drive bays
  • 8 FHFL dual-slot PCIe5.0 x16, 1 FHHL PCIe5.0 x8
  • Supports 2 M.2 (PCIe3.0 x4 or SATA 6Gb/s)
  • 1 OCP NIC 3.0 (PCIe5.0 x8)
  • 2 RJ45 (1GbE) by Intel® i350
  • Remote Management (IPMI)

Ready for testing; availability is verified in real time.

Configure & request a quote

Compose quote request

Opens your mail client with the configuration filled in. Nothing is sent or stored by this site.

Also available on Pantheon for GPUs, turbines, networking and memory.

How this is priced

TORmem quotes 4U8G-TURIN2/RF+ at three integration levels. What changes between them is how much of the build TORmem does before it ships.

LevelWhat's includedHow it's quoted
L6BareboneChassis, motherboard, backplane, power supplies, fans. No CPU, memory, GPU or drives. Quoted per unit, independent of configuration.
L10Configured nodeEverything in L6, plus CPU, DDR5, GPUs, NVMe, network adapters — assembled, firmware-matched and burn-in tested. Quoted from your configuration. Available now.
L11Rack-integratedEverything in L10, plus rack, PDUs, switching, optics, cabling, cluster-level validation and on-site delivery. Quoted per rack.

Barebone cost Available soon; full L10 pricing available now with customer configuration.

Minimum order Standard Model: No minimum order quantity applies. Availability will be confirmed based on real-time stock status.

Compare the range

Other gpu server platforms TORmem builds on the same generation.

ModelConfigurationProduction phaseStd lead time
1U1G2E-TURIN1-GPU BareboneComplete DVT (design validation test)16-20 wks
2U2G-TURIN/HPR2-GPU BareboneMass production16-20 wks
4U4G-TURIN/HPR4-GPU BareboneComplete DVT (design validation test)16-20 wks
4U8G-TURIN2/RF+this page8-GPU BareboneComplete DVT (design validation test)16-20 wks

← All products