Guides
AI infrastructure buyer guides: GPU servers, memory and rack power
Start with a buyer decision, then follow the technical and product paths behind it. These guides cover GPU server sourcing, cluster acceptance, inference memory, shared memory, rack power and the L10/L11 handover boundary.
Buyer decisions
Buyer guide · GPU servers
ODM GPU server sourcing
Turn a GPU server requirement into quotes you can compare line by line, from barebone to validated rack.
Read the guideBuyer guide · Shared memory
Shared AI memory options
Local DDR, CXL devices, RDMA appliances and software tiers: what each one needs from the host, and how to prove it.
Read the guideBuyer guide · Rack power
GPU rack power
Trace every PSU to a circuit, agree which meter is contractual, and witness a feed-loss test before shipment.
Read the guideBuyer guide · AI inference
Inference memory sizing
Work out KV-cache and weight memory from model dimensions and active tokens before picking a memory tier.
Read the guideBuyer guide · Cluster handover
GPU cluster acceptance
Set node, fabric, rack and workload pass criteria before shipment, so handover is a check rather than a negotiation.
Read the guideIntegration and handover
Guide · Rack integration
L11 rack integration
What gets racked, cabled and tested before an AI rack leaves the integrator, and which handover documents to ask for.
Read the guideGuide · Server integration
L10 server integration
How a barebone chassis becomes a configured, firmware-matched server, and where the L10 scope stops.
Read the guideGuide · Comparison
L10 vs L11
A tested server or a tested rack: scope, testing and handover compared side by side.
Read the guideThe levels TORmem builds to
| Level | What's included |
|---|---|
| L6 · Barebone | Chassis, motherboard, backplane, power supplies, fans. No CPU, memory, GPU or drives. |
| L10 · Configured node | Everything in L6, plus CPU, DDR5, GPUs, NVMe, network adapters — assembled, firmware-matched and burn-in tested. |
| L11 · Rack-integrated | Everything in L10, plus rack, PDUs, switching, optics, cabling, cluster-level validation and on-site delivery. |
Every build is specified with the client. Send a procurement brief or see L11 rack integration.
