Procurement desk / node to site

Memory-first. Procured across the whole compute stack.

TORmem designs disaggregated memory systems. The same engineering team runs procurement for the hardware around them, including servers, GPUs, networking, storage and racks. When a compute block needs on-site power, we coordinate the generation equipment through energy partners.

Scope of supplyOne counterparty
  • Built by TORmem

    Disaggregated memory systems

  • Sourced and integrated

    Compute, network, storage, racks

  • Coordinated through partners

    On-site power generation

WHO IT'S FOR

Executives & capacity owners

One accountable counterparty for a compute build, with the memory architecture decided up front rather than retrofitted.

Procurement & sourcing teams

Dated benchmarks, exact BOMs and written lead times you can take to an approval committee.

Data center developers

Compute blocks scoped against the power and cooling the site has today, or the generation it will need.

Integrators & NeoClouds

A sourcing route to memory, GPU servers, optics and integrated racks for your own customers.

WHAT WE PROCURE

Each line on a quote says who supplies it. Memory is our own product. Everything else is sourced, configured and validated by the same team, or coordinated with a named partner.

Built by TORmem

  • Disaggregated memory appliances
  • Memory-centric system architecture
  • L10 systems and L11 rack integration

Our patented architecture, specified and supported by the team that designed it.

Sourced and integrated

  • GPU and CPU servers from NVIDIA, AMD and Intel platforms and Tier-1 ODMs
  • DRAM, NVMe storage and NICs/DPUs
  • Switching, optics and transceivers
  • Rack-level air and liquid cooling

Configured to the workload, validated and burned in before it ships.

Coordinated through partners

  • Gas turbines and gas engines
  • Gas and diesel generator packages, 50 Hz and 60 Hz
  • Power and engineering for AI-ready sites

Supplied by energy partners. We carry the requirement, documents and timeline so the power arrives with the compute it runs.

Detail on the first two tiers: products, memory architecture and ODM/OEM sourcing.

COMPUTE BLOCKS, NODE TO SITE

Requests arrive at very different sizes. The block you're buying decides what we need from you up front.

  1. 01 / NODE

    A configured system

    One GPU, CPU or memory server built to the workload.

    We'll ask for

    Workload, quantity, target date

  2. 02 / RACK

    An L11 rack

    Compute, memory, fabric, storage and cooling, built and validated before it ships.

    We'll ask for

    Rack power budget (kW), cooling type, site

  3. 03 / CLUSTER

    Racks on one fabric

    Multiple racks with shared memory pools and rail-optimized networking.

    We'll ask for

    GPU count, fabric, facility readiness

  4. 04 / SITE

    Compute plus its power

    The cluster and the power to run it, from the grid, on-site generation or both.

    We'll ask for

    MW requirement, grid status, location, permitting timeline

HOW A REQUEST MOVES

  1. 01

    Requirement

    Equipment, quantities or MW, site, timeline, and the approval process you work to.

  2. 02

    Benchmark and options

    A dated market benchmark with source count and confidence, plus a primary and an alternate platform path.

  3. 03

    Verify and document

    Exact BOM and revision, firmware, condition of any equipment that isn’t new, and the warranty and compliance paperwork.

  4. 04

    Commit and deliver

    Commercial terms, logistics, integration, burn-in and acceptance at site.

What lands on your desk

  • A written quote with a line-item BOM
  • A dated market benchmark for each major line
  • Lead times, with named alternates for long-lead parts
  • Condition documentation for any equipment that isn’t new
  • Warranty, RMA and delivery scope in writing
  • One technical and commercial point of contact

START WITH A PROCUREMENT BRIEF

Tell us the categories, quantities or megawatts, the site and the date. We'll come back with options, a benchmark, and what we still need to know.

Power generation equipment is supplied by third-party energy partners. Availability, condition and commercial terms are confirmed for each requirement. Product and company names identify hardware TORmem sources and integrates. They don't imply any partnership, endorsement or authorized-reseller relationship.